Ready-mix concrete is ordered by the cubic yard, delivered by a truck that carries up to about 8 to 10 yards. This page is for ordering: it works out the volume of a slab or a set of round holes, adds extra, and rounds up to the quarter yard plants sell in.
Worked example: a 12 × 10 ft slab, 4 in thick
- Volume: 12 × 10 × (4 ÷ 12) = 40 ft³, or 1.48 yd³.
- Add 10% for spills and an uneven base: 1.63 yd³.
- Round up to the next quarter yard: order 1.75 yd³.
- That's under 3 yards, so ask about a short-load fee, or compare with 74 bags of 80 lb mix.
Ordering tips
- Measure inside the forms and check the depth in several spots.
- Tell the plant the job (slab, footing, driveway) so they send the right mix and strength.
- Plan access: the truck needs a firm path to the pour, or book a pump or wheelbarrows.
- Have help ready. A truck typically allows a limited time to unload before extra charges.
Cubic yards for common slabs (4 in thick, no extra)
| Slab | Cubic yards |
|---|---|
| 10 × 10 ft | 1.23 |
| 12 × 12 ft | 1.78 |
| 20 × 20 ft | 4.94 |
| 24 × 24 ft | 7.11 |
Common mistakes
- Ordering exactly. Running short mid-pour leaves a cold joint; a little extra is normal.
- Forgetting the short-load fee on small orders.
- Not checking the weather. Heat, cold and rain all affect the pour and the cure.
Questions people ask
How do I convert cubic feet to cubic yards?
Divide by 27.
What is a short-load fee?
An extra charge many plants add for small orders, often under 3 to 5 yards. Ask your supplier.
How much concrete is in a truck?
Typical mixers carry up to about 8 to 10 yd³.
Is a truck cheaper than bags?
Usually past 1 to 2 yards, but short-load fees can change that. Enter both prices under Compare my prices to see the difference for your job.