Screed calculator

Bags of cement and tonnes of sharp sand for a sand and cement floor screed, or the number of pre-mixed bags, from the floor area and depth.

Typical depths: bonded to the slab 25 to 40 mm, on a membrane 50 mm or more, floating over insulation or underfloor heating 65 mm or more. Follow your spec.

Tip: type meters like 3.8, or 380 cm. Prefer feet? Switch to ft / in at the top.

6.5 cm deep4 m3 m
Estimated
13bags of cement (25 kg)

plus 1.37 tonnes of sharp sand for 0.86 m³ of 1:4 screed. Or about 69 × 25 kg bags of pre-mixed screed.

  • Floor area12.0 m²
  • Depth6.5 cm
  • Screed volume0.86 m³ (with 10% extra)
  • Cement309 kg
  • Sharp sand1.37 tonnes
  • 850 kg bulk bags of sand2
  • Pre-mixed screed (25 kg bags)69

Estimate for a semi-dry sand and cement screed: dry materials = 1.25 × the laid volume (it compacts), split by the mix; cement at 1,440 kg/m³, sharp sand at 1.6 t/m³. Pre-mixed bags assume about 2 tonnes per m³ laid. Flowing (anhydrite) screeds are ordered by the m³ from the supplier.

Related calculators

A traditional sand and cement screed is sharp sand and cement mixed semi-dry, then compacted and levelled over a concrete slab or insulation. This calculator works out the cement in 25 kg bags and the sharp sand in tonnes for the mix you choose, or the number of pre-mixed screed bags.

Worked example: a 4 m × 3 m room, 65 mm deep, 1:4

  1. Volume: 4 × 3 × 0.065 = 0.78 m³. Add 10%: 0.86 m³.
  2. Dry materials: 0.86 × 1.25 = 1.07 m³ (semi-dry screed compacts as you lay it), split into 1 part cement and 4 parts sand.
  3. Cement: 1.07 ÷ 5 × 1,440 kg = 309 kg, so 13 bags of 25 kg. Sharp sand: 1.07 × 4/5 × 1.6 t = 1.37 tonnes.
  4. Pre-mixed instead: 0.86 m³ × about 2 tonnes ÷ 25 kg = 69 bags.

How deep should screed be?

  • Bonded directly to a clean concrete slab: often around 25 to 40 mm.
  • Unbonded on a damp-proof membrane: around 50 mm or more.
  • Floating over insulation or underfloor heating pipes: around 65 mm or more (75 mm for heavier use).
  • Measure the depth in a few places; old floors are rarely level, so use the average.

Which mix?

Mix (cement : sharp sand)Use
1:3Stronger screed, often over underfloor heating
1:4Standard floor screed
1:5Light levelling where strength isn't critical

Tips

  • Sharp sand (concreting sand), not soft building sand.
  • Semi-dry mix: it should hold together when squeezed in your hand without water running out.
  • Drying time: a common rule is about 1 day per mm for the first 40 mm before laying moisture-sensitive floors; check with a moisture meter.

Common mistakes

  • Ordering sand for the laid volume only. Semi-dry screed compacts, so you need more loose material than the finished volume.
  • Laying it too thin over insulation, where it can crack.
  • Using building sand, which makes a weak, dusty screed.

Questions people ask

How much sand and cement do I need for screed?

For a 1:4 mix, about 14 bags of 25 kg cement and 1.6 tonnes of sharp sand per m³ laid, before any extra for waste.

How many bags of cement for 1 m³ of screed?

About 18 bags at 1:3, 14 at 1:4 and 12 at 1:5 (25 kg bags), by this estimate.

What is the mix ratio for floor screed?

1:3 to 1:5 cement to sharp sand by volume; 1:4 is the usual choice.

How many bags of pre-mixed screed do I need?

Roughly volume (m³) × 2,000 ÷ 25. A 0.78 m³ floor needs about 63 bags, plus extra for waste.

Embed this calculator on your site

Free for any website or blog. Paste this code where you want the calculator. It resizes itself, works on phones, and has no ads or tracking.

Sources and limits

Last checked 25 November 2026. Results are estimates: product labels, your supplier and your local code come first. How we calculate · Report a mistake